Share

Related Links

Related Stories

  • Mecca clock tower features Gurit composites
    The huge clock tower at the centre of the Abraj-Al Arab development in Mecca, Saudi Arabia, was constructed using composite materials from Gurit.
  • Building on the advantages of composites in construction
    Construction is one of the largest markets for composites globally. While growth has slowed in regions hit by a decline in residential housing construction, including Europe and North America, China and other parts of Asia are experiencing strong growth in this market. Richard Stewart reports on trends in composites in construction and innovative applications utilising FRP materials.
  • JEC Composites Show 2009 – preview
    This year's JEC Composites Show takes place on 24-26 March in Paris. In our preview we take a look at some of the developments on display.
  • Composites on the road to the big time?
    Materials and processing technologies hold the key to the future success of composites in the automotive market.
  • Composites in construction advance in new directions
    The growing demand for everything green to promote sustainability is being felt increasingly in the building and construction industry. The internationally recognised LEED initiative of the US Green Building Council promotes alternative, energy-efficient materials, which is good for composites. So are the building codes and standards being written for FRP materials.

Top 5 Stories

News

Composite cladding for Mecca clock tower

10 December 2008

Premier Composite Technologies has been awarded the contract to build the 35 000 m2 of composite cladding that will be used on the upper 200 m of the Dokkae Tower in the holy city of Mecca, Saudi Arabia.

DIAB, a manufacturer of core materials for use in sandwich composite structures, has won a contract from Premier Composite Technologies to supply core materials for the sandwich composite cladding, which will comprise carbon/glass/epoxy skins over a Divinycell P thermoplastic core material. This will be covered in Italian mosaic tiles of which 13 000 m2 will be gold tiles.

The tower will feature the world’s largest clock; two of the four faces of the clock will measure 43 m in diameter. The clock faces will also be built using sandwich composites based on Divinycell P core. More than 600 000 LEDs will be integrated into the sandwich laminates in order to light up the clock faces at night.

Carbon/epoxy composites are also being used to construct the hands of the clock, which are up to 23 m long. These will also be lit with LEDs.

Over 8000 m2 of Premier Composite Technologies’ recently-expanded production facilities in Dubai, UAE, has been dedicated to the production of the cladding. There will be 250 people involved in the production and tiling of Dokkae Tower when it is fully up and running.

 

This article is featured in:
Construction

 

Comment on this article

You must be registered and logged in to leave a comment about this article.