product promo ad
 
Wind energy

- 23 April 2008 -
Suzlon announces blade retrofit for S88 turbines

INDIAN WIND turbine maker Suzlon Energy Ltd has announced a retrofit programme to resolve blade cracking issues associated with some of its S88 turbines in the USA.

The retrofit programme involves the structural strengthening of 1251 (417 sets) blades on the 2.1 MW turbines. 930 of the blades are already installed while the remaining blades are in transit or inventory.

The total estimated cost of the retrofit programme is estimated at INR100 crores (US$25 million).

Suzlon says the retrofit programme will be carried out by maintaining a rolling stock of temporary replacement blades, to minimise the downtime for operational turbines, and will be completed over a period of six months.

Suzlon; www.suzlon.com

<<back

Get more with RP Weekly

To receive news and features like this every week direct to your inbox sign-up for RP Weekly.

Simply register your details to receive this free email roundup of the latest from the composites industry.

If you would like to advertise on RP Weekly please contact our sales team.

Something we've missed?

If you have some news for the composites industry or would like to comment on any of the articles on this site, contact our editorial team.

You can also access the full list of contacts here.

 


bottop banner advert